RWL operatives are progressing well with the installation of the new kerb line on our Fordingbridge project
Kerbs laid on a 150mm ST2 concrete bed, using an excavator-mounted lifting aid to reduce manual handling on the Fordingbridge site.

The kerbs are being laid on a 150mm ST2 concrete bed, ensuring a solid and durable foundation. To reduce manual handling and improve safety, the team is using an excavator equipped with a lifting aid to accurately position each kerb.
Great work by the team on maintaining high standards in both quality and health & safety.
The operative is carefully bedding the kerb stone to the correct level using the string line as a guide, then checking to ensure the kerb is level and properly aligned.
Kerbs are being laid to pins set out by our engineer, ensuring accurate alignment and correct elevation throughout the installation.