RWL continue works at Titchfield
Central reservation toucan crossing, kerbs, tactiles, guardrail, NAL ducting and surfacing complete at the A27 Segensworth scheme.

Newly constructed central reservation toucan crossing, surfaced complete with tactiles, kerbs, high visibility pedestrian guardrail, NAL box, NAL Sockets, Traffic signals ducting.
Extended central reservation surfaced with 6mm tarmac.
Extended central reservation, all top soiled waiting to be seeded, with new controlled toucan crossing installed for pedestrians to gain access to the new housing development at A27 Segensworth.
Guided auger launch pit with sheets and frame installed as shoring following temporary works designs and a reinforced concrete base and thrust block wall poured to withstand the forces generated from the auger.
Pedestrian toucan crossing complete with a maintenance layby. Pedestrian guard rail, tactiles.
Constructed traffic signals maintenance bay, complete with splay and HB2 kerbs, all waiting to be surfaced on the final week.