30 January 2025

Infrastructure Excellence: R&W Langley's Latest Project Updates

Project updates from Pennyfarthing Homes Fordingbridge, Canford Park, AFC Corsham and Lovell's S278 junction improvements.

R&W Langley continues to demonstrate its expertise across multiple infrastructure projects throughout the South of England. From residential developments to sporting facilities, our teams are delivering crucial infrastructure works that will serve communities for generations to come.

Pennyfarthing Homes Development, Fordingbridge

At our Salisbury Road site, we're showcasing our comprehensive approach to infrastructure development. Our skilled operators are utilising an array of specialist plant equipment, including 8-ton and 25-ton excavators, to create new road formations and sustainable drainage solutions.

A particular highlight of this project is the installation of a sophisticated SUDS drainage system. Our teams have expertly formed a new drainage pond and multi-layered swale, demonstrating our commitment to sustainable infrastructure solutions. These features will play a crucial role in managing surface water and protecting the local environment.

The precision of our work is evident in every detail, from the careful preparation of Type 1 sub-base for road formations to the meticulous setting out of kerb lines by our site engineers.

Canford Park Development

At Knighton Lane, our teams are undertaking significant S278 works to transform a single-lane track into a dual-lane access road serving the new Canford Park Development Site. The works include careful widening of the existing carriageway, installation of new kerbing, and comprehensive sub-base works.

AFC Corsham Enhancement

At AFC Corsham, we're expanding parking facilities to accommodate 64 additional spaces. The project includes careful excavation works, installation of timber edgings, complete resurfacing and new line marking.

Lovell's S278 Junction Improvements

Our junction improvement scheme involves widening existing carriageways to accommodate new pedestrian crossings and islands, with engineered setting out and drainage installation.

Commitment to Quality

Across all these projects, several themes define R&W Langley's approach: technical excellence with specialist plant and skilled teams; sustainable solutions through SUDS drainage and environmental care; minimal disruption through careful planning in live highway environments; and rigorous quality assurance from set-out to finishing.

#R&W Langley#Infrastructure#S278#SUDS